Customization: | Available |
---|---|
Casting Method: | Sand Casting |
Casting Form Material: | Metal |
Still deciding? Get samples of US$ 35/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model NO. | OEM | Product Name | OEM Casting Service |
Application | Hydraulic Machinery Parts | Technology | Shell Coated Sand Casting ,Gravity Casting |
Material | Iron Casting | Lead Time | 50 Days |
Package | Cartons+Wooden Case/Pallet | Inspection | 100% Visual Inspection |
Surface Preparation | Sand Blasting, Shot Blasting | Surface Roughness | Ra25 |
Casting Tolerance | '+/-1mm | Standard | GB |
Certification | ISO9001:2015 | MOQ | 200 PCS |
Specification | OEM | Trademark | ZC |
Origin | China | Production Capacity | 600tons/Month |
R&D | Softward: Solidworks, CAD, Procast, UG.Development cycle of samples: 30-40 days |
Materials | Gray Iron,Ductile Iron |
Technical Parameter | Part weight: 1kg to 50kgs |
Max dimension : 500mm for diameter or length | |
Min wall thickness : 7mm | |
Tolerance of casting: CT8 | |
Surface treatment | Sand Blasting, Shot Blasting |
Inspection | Endoscopy,Breinell Tester,Tensile Tester |
Production capacity | More than 600 tons per month |
Quality Certificates | ISO9001:2015 |
Our company has a complete inspection and test feedback system, equipped with advanced environmentally friendly automatic shell production line, coated sand production line, the production of castings qualification rate far exceeds the qualification rate of peer products, product quality belongs to the leading position in the industry, and has been greatly recognized by customers.
Q1: What is our payment term?
A:T/T
Q2: How can we quote for you?
A: Please email us enquiry with all technical drawings you have, such as material grade, tolerance, mechanical properties, requirements, etc. Our specialized engineers will check and quote for you within 24 hours.
Q3: Which product are often processed by your company ?
A: Hydraulic motor parts,hydraulic steering gear part, gear pump part, plunger pump parts, valve body,multitandem valve
Q4: Which material are often used ?
A: Gray iron, ductile iron
Q5: Which finish you can provide ?
A:Sand blasting, shot blasting
Q6: What is the MOQ ?
A: Based on the product, normal 200 pcs.
Q7: Can we make the samples?
A: Sorry
Q8: How about for the lead time?
A: Normally about 40 days for mass production, pls inform us if it is urgent order.